August 25, 2020
Revision as of 20:25, 25 August 2020 by Lukawiecki (talk | contribs)
Meetings | ||
---|---|---|
Previous Meeting: August 18, 2020 | Meeting Procedure | Next Meeting: September 1, 2020 |
Time and Place
Time: 7:30 PM
Place: Telecom
To join the video meeting, click this link: https://meet.google.com/kmo-jxzu-auc
Otherwise, to join by phone, dial +1 513-760-6776 and enter this PIN: 863 676 973#
To view more phone numbers, click this link: https://tel.meet/kmo-jxzu-auc?hs=5
2701 Buildout Floor Plan: File:2701InitialMoveInLayout.pdf
Weekly Meeting Agenda
COVID
- The following items are mandatory for all members, guests and others entering our space:
- Wear a mask at all times in the 2701SG building
- Sign in and Sign out at the front inner entrance
- Maintain social distancing
- Sanitize surfaces you come into contact with. We have paper towels and disinfectant spray.
- https://coronavirus.ohio.gov/static/responsible/Responsible-Protocols.pdf
Buildout and Return to Operation
- 2701 Buildout Floor Plan: File:2701InitialMoveInLayout.pdf
- The Moving Hive13 Trello Board has been updated with "To-Do" lists for each space
- When is next big push?
- Dust Collection?
- Bathroom/Kitchen?
Steel Group-Buy
- Kevin is organizing a group-buy for 1" and 2" square steel tube
- massive price break if we can get 25 pcs. of each (got this for both lengths)
- ~$11.03/24 ft. pc. for 1" x 1" x 16g tube
- ~$26.27/24 ft. pc. for 2" x 2" x 16g tube
- message Kevin with your desired quantities, ordering tomorrow (2020-08-26), so get your requests in tonight if you haven't
Votes
- Tonight's Votes
- Discuss tonight, vote next week:
- Revision to Vertical Storage Rules
- Was always meant to be temporary storage, but people get a space then squat there forever, refuse to give them up, causes stress on wardens and leadership, and prevents new people being able to use vertical storage
- Discussion on possible changes here (vote withdrawn for now while discussion continues)
- New Vote Posted Here
- PPE, Safety, and Cleaning Supplies
- Revision to Vertical Storage Rules
Frisbee Round
- What creative or maker related things have you worked on recently or want to work on?
- Guests: How did you hear about Hive13? What kind of activities are you interested in?
Minutes
Attendance
- Dave Blundel, Kayla Lukawiecki, Lisa Crump, John Clark, Dave Velzy, Chris Davis, Drew Kirkman, John Osterman, Brad Walsh, Kevin McLeod, Chris Hodapp, Nancy Graven, Dave Schwinn
Votes
- 2 votes passed;
- Remove/Discard Power Tool Drag Racing and Trebuchet Equipment: 14 Yes, 1 abstain, 0 No.
- $250 for Steel for random Hive13 Improvement Projects: 20 Yes, 0 No
- Upcoming votes
Upcoming Hive13 Improvements
- Saturday, August 29th, 11am start time Working towards completing wire pulling for panel Z. Also, cable pulling for camera point towards the front door
Completed Projects
- We have RFID access! Thanks to everyone who helped with that! Door is the red door to the right of main front door under "The Huenefeld Company"
- We have another AC hooked up
- Contacted Wesselman re: fire extinguishers. He basically said go ahead and take what you need from downstairs; Score! Also has contract for inspection, current ones good til December. mounting brackets on the way
- Another AC unit hooked up! We have 2 big ones and another small one. Maybe small one in the lounge, and big guys in the metal shop and woodworking?
- One is lacking mounting hardware, we can fix it!
Other Notes
- Kevin M has been offering welding certification on Thursdays. Next available spot is Sept. 10. Contact him if you're interested
- Fridge moved to more central location, also moving soda machine to more central location. Makes sense for larger space.
- Thanks to everyone who has been contributing to the drink fund. It's next to the fridge, if you'd like to contribute.