Board Meeting - May 14th, 2018
Board Meetings | ||
---|---|---|
Previous: April 9th, 2018 | Meeting Procedure | Next: June 11th, 2018 |
Agenda
- Open Finance Website updates
- Review Membership Report
- Report should have been sent to leadership the morning of the meeting.
- New Member sign-up procedures
- Two officer signatures required - change the form to make clear it's approval of the candidate as a member, not having received the form
- Physical Plant Status
- Saturday Cleanup - punt due to roofing? Focus on something else?
- Roof Repair status
- Annex
- Heating still needs work, but that'll likely be punted to October or so.
- Electrical and Network Wiring - We're ready to run the 240V power?
- Move status
- Greg is working hard on getting the door controller onto a circuit board instead of a breadboard.
- A/C Status
- Kitchen unit was bad; replaced with spare
- One of the units in the wood shop is bad
- We currently have 5½ tons in the main area and a little less than a ton in the annex
- The annex and the main room both really need another ton.
- Should put a vote up for two additional units - one with a heat pump for the lounge, then move the current unit to somewhere else
- We seem to be able to keep the Hive about twelve degrees below ambient.
- Lounge Expansion
- Storage
- Vertical Storage
- Finish steps
- Finish slots
- Number slots and add to intweb
- Shelf D
- Needs to be lined and numbered
- Finish purging the stuff there
- Vertical Storage
- intweb
- What can it do to make your job easier?
- Upcoming features - membership applications, voting, direct link to member profile
- Bug or feature request? Put it on GitHub. See Greg or Ian for help with that.
- Consider having Certifications and Tool Reservation on it
- Warden positions to fill
- Elections
- Two months away
- Anything to get ready for them?
- Bylaws
- Probationary membership period
- Create clear procedures for suspension and/or expulsion. Be fair, but make sure problems can be dealt with.
- This may eliminate the need for a probationary period.
- Protection of members' personal information, digital rights, dignity
- Clean up stupid spelling errors, etc.
- Re-invigorating Hive Culture
Attendees
Minutes
Open Finance Website updates
- Ian - No updates to the website itself.
Review Membership Report
- Greg - The membership report did not get sent out.
- Ian - Dammit.
- The report arrived towards the end of the meeting. Members with outstanding payments were reviewed, and will be contacted as appropriate.
New Member Signup
- TODO - Ry owes us a form edit.
- TODO - Ry will also create a minor liability waiver.
Physical Plant Status
- Saturday cleanup is canceled for the 26th due to memorial day. It has been replaced with a cookout.
- The Roof repair has not been started on the kitchen side
- Greg is pondering how to run the 220v power for the laser
- Greg is working on fabricobbling a circuit board for the annex door.
- AC status
- the kitchen unit went bad, and has been replaced with our existing spare.
- We have 5 tons in the main area, and a ton in the annex.
- AC sale at Costco.
- TODO Greg to investigate prices.
- TODO Ryan to resume work on the vertical storage after PTDR.
- TODO Greg to label Rack D storage spots
- TODO Greg to review member storage. We now have more requests than we have available space.
- Brad mentions getting a beadblast cabinet?
Intweb
- Possible next feature - signups and form generation.
- Possible heatmap of hive activity.
- Considering tracking tool certifications in intweb.
Warden Positions
- Wood - Greg to discuss with Mike Nute
- Fablab - Lorin
- Metal - Open
- Dave - Machining
- Brad - Electronics
- We could discuss changing the wardens at the annual meeting.
- TODO Greg to consider not defining the precise positions in the addendum.
Elections
- Two months away.
- To prepare - Can we automate the voting?
- Ian could spin up the same system from last year.
- TODO Ryan to post to the mailing list inviting people to run for positions
- Bylaw Changes
- Probationary membership period?
- Create clear procedures for suspension and/or expulsion. Be fair, but make sure problems can be dealt with.
- This may eliminate the need for a probationary period.
- Protection of members' personal information, digital rights, dignity
- Clean up spelling errors.
- Have a draft resolution of the three issues.
- TODO Greg - spelling, suspensions
- TODO Ian, Ryan - personal information
Reinvigorating Hive Culture
- Need to hold more social events
- return of movie night
- outreach
- TODO WillB to announce his leatherworking class via meetup
- reddit weekend happenings
- summer open house? we haven't had one in a couple years.