Electrical System - 2929 Historical: Difference between revisions

From Hive13 Wiki
Jump to navigation Jump to search
No edit summary
(50 intermediate revisions by 5 users not shown)
Line 1: Line 1:
We have one. This will contain a drawing of where all of our outlets are, how the are wired together, what voltage and current they can handle, and what breaker they are connected to.
<br />
==General Information==
<big>'''Note: This entire page needs to be redone for the new 2701 location. Everything here is historical information about our former 2929 location.'''</big>
*We use white-colored outlets, switches, and wall plates.  Some of the older stuff is a mix of ivory and black, but use white whenever purchasing anything.
*If it's installed on masonry, use galvanized steel plates and white outlets.


== Needed Upgrades ==
==Needed Upgrades==
=== Important ones ===
# Fab lab 240V 20A drop for the new laser + chiller.
# Fab lab 120V 20A drop - four outlets on the east wall.
# Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
# Install an extra plug spot on the 220V outlet in the woodworking area so we can have both the dust collector and table saw running at the same time.
# A high-amperage 120/240 drop in the dirty room.  50A at least; 60A would be better.
# At least one drop to the electronics area.
=== Still need to plan these ===
* Inspect load on main space light circuit and see if we can put two to four more lights on it.  (Greg and Jon discovered it's about 6&frac12; amps, so there's room.)
* Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
* One more light in the woodworking area. (badly needed)
* One more in the CNC area. (not as badly needed)
* One more over meeting area. (not as badly needed)


=== Layout ===
===Deferred===
We're putting a 125A panel into the dirty room and branching out from there.  I've re-arranged the upgrades above in the order they'll likely get done [[User:Greg J Arnold|Greg J Arnold]] - ([[User talk:Greg J Arnold|talk]]) 22:27, 20 July 2015 (EDT)


== Current outlet layout ==
*Popcorn machine (Waiting for machine's final destination)
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
 
===Lighting===
 
*Inspect load on main space light circuit and see if we can put two to four more lights on it.  (Greg and Jon discovered it's about 6&frac12; amps, so there's room.)
*One more light in the woodworking area. (high importance)
 
===The annex===
 
*A 20A 120V drop for new and existing lighting and the ceiling fan.
*Figure out what the hell is wrong with the one outlet that pops breakers when stuff's plugged into it.
 
==Breaker panels==
We put a new breaker panel in the dirty room.  It is fed from Panel 2, and supplies 125A.  This will allow us to run more circuits, as they will be cheaper and easier.  The drawing will get some updates when I (Greg) track down the source.
 
===[[Electrical System/Panel 1|Panel 1]]===
{{:Electrical System/Panel 1}}
 
===[[Electrical System/Panel 2|Panel 2]]===
{{:Electrical System/Panel 2}}
===[[Electrical System/Panel 3|Panel 3]]===
{{:Electrical System/Panel 3}}
 
==Current outlet layout==
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1, 2, or 3) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
[[File:HIVE13.floor.plan.outlets.png]]
[[File:HIVE13.floor.plan.outlets.png]]


== Lights ==
==Lights==
The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
 
The main lights in the space I believe are on breaker 4.
*The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
The electronics area lights are on ??
*The main lights in the space I believe are on breaker 4.
The kitchen area lights are on ??
*The electronics area lights are on ??
The dirty room lights are on??
*The kitchen area lights are on ??
*The dirty room lights are on??
 
=Log=
====Saturday, Aug. 22, 2015====
[[User: reportingsjr | Jon]] and [[User: Greg J Arnold | Greg]] poured blood, sweat, and tears into getting the conduit installed for panel 3.  All that remains is feeding four strands of prohibitively stiff wire through eighty feet of conduit, then we'll have power!
====Tuesday, Aug. 25, 2015====
[[User: reportingsjr | Jon]] , [[User: Greg J Arnold | Greg]] and Andrew got three of the wires run through the conduit. Close!
====Tuesday, Sept. 1, 2015====
 
[[User: reportingsjr | Jon]] , [[User: Greg J Arnold | Greg]] and Andrew got the last wire through the conduit. Bought the wrong size lug nut for the neutral tie in for panel 2, but we got the power running temporarily until we can fix that. Jon ran wire from panel 3 to the two unfinished boxes in the dirty room and the box by the electronics area. They only need to be tied in to panel 3. The high intensity LED light was also tied in to the switch for the welding warning light.
 
====Tuesday, Sept. 8, 2015====
[[User: Greg J Arnold | Greg]] finished installing the neutral wire into the panel, so it is now completely working.  The feed to the electronics area was also completed.
 
====Tuesday, Sept. 15 2015====
[[User: Greg J Arnold | Greg]] finished installing the west wall dirty room drop and removed the odd wire coming off of the meeting room wall drop.
 
====Tuesday, March 15, 2016====
[[User: Greg J Arnold | Greg]] added a switch for the [[CNC Router]].
 
====Thursday, July 5, 2018====
[[User: Greg J Arnold|Greg]] changed around P3B1&3 and P3B5 to be in each other's place so that the 220V drop could power the [[Lounge]]'s A/C.
 
====Wednesday, October 3, 2018====
[[User: Greg J Arnold|Greg]] added a NEMA 14-50 receptacle on the north wall of the Metal Room.


== Breaker boxes ==
=NEMA Connectors in use=
Take pictures of breaker box or just make a drawing of it?
==NEMA 6-50==
[[File:NEMA 6-50R.jpg|thumb|A NEMA 6-50 Receptacle|left]]

Revision as of 10:17, 23 December 2021


General Information

Note: This entire page needs to be redone for the new 2701 location. Everything here is historical information about our former 2929 location.

  • We use white-colored outlets, switches, and wall plates. Some of the older stuff is a mix of ivory and black, but use white whenever purchasing anything.
  • If it's installed on masonry, use galvanized steel plates and white outlets.

Needed Upgrades

Deferred

  • Popcorn machine (Waiting for machine's final destination)

Lighting

  • Inspect load on main space light circuit and see if we can put two to four more lights on it. (Greg and Jon discovered it's about 6½ amps, so there's room.)
  • One more light in the woodworking area. (high importance)

The annex

  • A 20A 120V drop for new and existing lighting and the ceiling fan.
  • Figure out what the hell is wrong with the one outlet that pops breakers when stuff's plugged into it.

Breaker panels

We put a new breaker panel in the dirty room. It is fed from Panel 2, and supplies 125A. This will allow us to run more circuits, as they will be cheaper and easier. The drawing will get some updates when I (Greg) track down the source.

Panel 1

(20A) 1 2 Hallway + Gillian Thompson (20A)
Sprinkler Alarm - Mid Bldg (20A) 3 4 ? (20A)
? (20A) 5 6 Several dirty room outlets, one woodworking area outlet,

one outlet behind hand tools shelf (20A)

Outer lounge corner pillar and CNC ACs (20A) 7 8 Pillar by thermostat (20A)
? (20A) 9 10 Meeting area pillar and kitchen lights (20A)
? (20A) 11 12 West wall outlets (20A)
? (20A) 13 14 ? (20A)
Lobby Lights + Electrical Room (20A) 15 16 ? (20A)
Furnace 2nd floor (20A) 17 18 Emergency lights 2nd Flr (20A)
Lounge North and East walls (20A) 19 20 Gillian Studio Kiln (50A)
Unit #2 Lights (20A) 21 22
Server rack (20A) 23 24 At least some in the Annex. (20A)
Outlet behind manual mill (20A) 25 26 Outlets Overhead Lights (20A)
Woodworking area pillar (20A) 27 28 Behind fridge (20A)
Woodworking area outside wall (20A) 29 30 Lounge North wall, west corner(20A)
  • Circuits P1B28 and P1B30 share a neutral but are NOT gang-trip.

Panel 2

? (20A) 1 2 Feed to Panel 3 (125A)
Hive E Wall (20A) 3A 4
? (20A) 3B
? (50A) 5 6 ? (50A)
7 8
Body Shop (50A) 9 10 Furnace (60A)
11 12
Furnace (20A) 13 14 Dust collector (20A)
15 16
Big CNC (20A) 17 18 Compressor (20A)
19 20
Hive13 Welder (50A) 21 22 Annex East Wall for 3D Printers (20A)
23 24 Pillar DE12 in the Annex (20A)
A/Cs in Annex (30A) 25 26 Big Laser (20A)
Blank 27 28
Blank 29 30 Blank

Panel 3

Lounge A/C (20A) 1 2 Single drop to A/C on west wall (15A)
3 4 Outlet next to breaker panel (20A)
South wall of Lounge (20A) 5 6 Blank (20A)
Drop on dirty room west wall (20A) 7 8 Drop on Dirty Room North Wall (20A)
Meeting area lights (20A) 9 10 Exhaust Fan (20A)
NEMA 14-50 Receptacle on Metal Room North Wall (60A) 11 12
13 14 Lathe (20A)
(20A) 15 16
(20A) 17 18 Outlet above new storage (20A)
Blank 19 20 (20A)
Blank 21 22 (20A)
Blank 23 24 Blank

Current outlet layout

This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1, 2, or 3) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark). HIVE13.floor.plan.outlets.png

Lights

  • The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
  • The main lights in the space I believe are on breaker 4.
  • The electronics area lights are on ??
  • The kitchen area lights are on ??
  • The dirty room lights are on??

Log

Saturday, Aug. 22, 2015

Jon and Greg poured blood, sweat, and tears into getting the conduit installed for panel 3. All that remains is feeding four strands of prohibitively stiff wire through eighty feet of conduit, then we'll have power!

Tuesday, Aug. 25, 2015

Jon , Greg and Andrew got three of the wires run through the conduit. Close!

Tuesday, Sept. 1, 2015

Jon , Greg and Andrew got the last wire through the conduit. Bought the wrong size lug nut for the neutral tie in for panel 2, but we got the power running temporarily until we can fix that. Jon ran wire from panel 3 to the two unfinished boxes in the dirty room and the box by the electronics area. They only need to be tied in to panel 3. The high intensity LED light was also tied in to the switch for the welding warning light.

Tuesday, Sept. 8, 2015

Greg finished installing the neutral wire into the panel, so it is now completely working. The feed to the electronics area was also completed.

Tuesday, Sept. 15 2015

Greg finished installing the west wall dirty room drop and removed the odd wire coming off of the meeting room wall drop.

Tuesday, March 15, 2016

Greg added a switch for the CNC Router.

Thursday, July 5, 2018

Greg changed around P3B1&3 and P3B5 to be in each other's place so that the 220V drop could power the Lounge's A/C.

Wednesday, October 3, 2018

Greg added a NEMA 14-50 receptacle on the north wall of the Metal Room.

NEMA Connectors in use

NEMA 6-50

A NEMA 6-50 Receptacle