Difference between revisions of "Electrical System"

From Hive13 Wiki
Jump to navigation Jump to search
(Needed Upgrades)
Line 12: Line 12:
  
 
== Current layout ==
 
== Current layout ==
Include [[floorplan]] map with outlets labeled.
+
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
 
+
[[File:HIVE13.floor.plan.outlets.png]]
 
== Breaker boxes ==
 
== Breaker boxes ==
 
Take pictures of breaker box or just make a drawing of it?
 
Take pictures of breaker box or just make a drawing of it?

Revision as of 13:31, 30 December 2014

We have one. This will contain a drawing of where all of our outlets are, how the are wired together, what voltage and current they can handle, and what breaker they are connected to.

Needed Upgrades

  • Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
  • Fab lab could do with another 120V 20A drop.
  • Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
  • Inspect load on main space light circuit and see if we can put two to four on it.
    • One more light in the woodworking area. (badly needed)
    • One more in the CNC area. (not as badly needed)
    • One more in the dirty room. (badly needed)
    • One more over meeting area. (not as badly needed)

Current layout

This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark). HIVE13.floor.plan.outlets.png

Breaker boxes

Take pictures of breaker box or just make a drawing of it?