== Needed Upgrades ==
 
== Needed Upgrades ==
 
=== Important ones ===
 
=== Important ones ===
# Fab lab 240V 20A drop for the new laser + chiller.
 
 
# Fab lab 120V 20A drop - four outlets on the east wall.
 
# Fab lab 120V 20A drop - four outlets on the east wall.
 
# Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
 
# Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
Line 16: Line 15:
 
* One more over meeting area. (not as badly needed)
 
* One more over meeting area. (not as badly needed)
  
=== Layout ===
+
== New breaker panel (Panel 3) ==
We're putting a 125A panel into the dirty room and branching out from there.  I've re-arranged the upgrades above in the order they'll likely get done - [[User:Greg J Arnold|Greg J Arnold]] ([[User talk:Greg J Arnold|talk]]) 22:27, 20 July 2015 (EDT)
+
We put a new breaker panel in the dirty room.  It will be fed from Panel 2 (I think?), and supplies 125A.  This will allow us to run more circuits, as they will be cheaper and easierThe drawing will get some updates when I track down the source.  The plugs will be labelled when I find a labeller.
 +
 
 +
=== Circuits in Panel 3 ===
 +
 
 +
{| border="1" style="border-collapse:collapse" cellpadding="3" cellspacing="3"
 +
| rowspan="2" | [[Big laser purchasing checklist | New Laser and chiller]] (20A)
 +
| align="right" | 1
 +
| 2
 +
| Spare 15A Breaker
 +
|-
 +
<!-- 3 would go here -->
 +
| align="right" | 3
 +
| 4
 +
| Blank
 +
|-
 +
| Blank
 +
| align="right" | 5
 +
| 6
 +
| Blank
 +
|-
 +
| Blank
 +
| align="right" | 7
 +
| 8
 +
| Blank
 +
|-
 +
| Blank
 +
| align="right" | 9
 +
| 10
 +
| Blank
 +
|-
 +
| Blank
 +
| align="right" | 11
 +
| 12
 +
| Blank
 +
|}
  
 
== Current outlet layout ==
 
== Current outlet layout ==
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
+
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1, 2, or 3) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
 
[[File:HIVE13.floor.plan.outlets.png]]
 
[[File:HIVE13.floor.plan.outlets.png]]
  
 
== Lights ==
 
== Lights ==
The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
+
*The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
The main lights in the space I believe are on breaker 4.
+
*The main lights in the space I believe are on breaker 4.
The electronics area lights are on ??
+
*The electronics area lights are on ??
The kitchen area lights are on ??
+
*The kitchen area lights are on ??
The dirty room lights are on??
+
*The dirty room lights are on??
 
 
== Breaker boxes ==
 
Take pictures of breaker box or just make a drawing of it?
 

Revision as of 15:49, 22 July 2015

We have one. This will contain a drawing of where all of our outlets are, how the are wired together, what voltage and current they can handle, and what breaker they are connected to.

Needed Upgrades

Important ones

  1. Fab lab 120V 20A drop - four outlets on the east wall.
  2. Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
  3. Install an extra plug spot on the 220V outlet in the woodworking area so we can have both the dust collector and table saw running at the same time.
  4. A high-amperage 120/240 drop in the dirty room. 50A at least; 60A would be better.
  5. At least one drop to the electronics area.

Still need to plan these

  • Inspect load on main space light circuit and see if we can put two to four more lights on it. (Greg and Jon discovered it's about 6½ amps, so there's room.)
  • Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
  • One more light in the woodworking area. (badly needed)
  • One more in the CNC area. (not as badly needed)
  • One more over meeting area. (not as badly needed)

New breaker panel (Panel 3)

We put a new breaker panel in the dirty room. It will be fed from Panel 2 (I think?), and supplies 125A. This will allow us to run more circuits, as they will be cheaper and easier. The drawing will get some updates when I track down the source. The plugs will be labelled when I find a labeller.

Circuits in Panel 3

New Laser and chiller (20A) 1 2 Spare 15A Breaker
3 4 Blank
Blank 5 6 Blank
Blank 7 8 Blank
Blank 9 10 Blank
Blank 11 12 Blank

Current outlet layout

This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1, 2, or 3) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark). HIVE13.floor.plan.outlets.png

Lights

  • The fab lab and lounge lights are tied in to the majority of the outlets in those room. They are on P1B19.
  • The main lights in the space I believe are on breaker 4.
  • The electronics area lights are on ??
  • The kitchen area lights are on ??
  • The dirty room lights are on??