Electrical System - 2929 Historical: Difference between revisions
Jump to navigation
Jump to search
Reportingsjr (talk | contribs) |
Reportingsjr (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
== Current layout == | == Current layout == | ||
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark). | |||
[[File:HIVE13.floor.plan.outlets.png]] | |||
== Breaker boxes == | == Breaker boxes == | ||
Take pictures of breaker box or just make a drawing of it? | Take pictures of breaker box or just make a drawing of it? |
Revision as of 14:31, 30 December 2014
We have one. This will contain a drawing of where all of our outlets are, how the are wired together, what voltage and current they can handle, and what breaker they are connected to.
Needed Upgrades
- Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
- Fab lab could do with another 120V 20A drop.
- Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
- Inspect load on main space light circuit and see if we can put two to four on it.
- One more light in the woodworking area. (badly needed)
- One more in the CNC area. (not as badly needed)
- One more in the dirty room. (badly needed)
- One more over meeting area. (not as badly needed)
Current layout
This is a very rough layout of where outlets are in the hive. The text is the circuit breaker panel (panel 1 or 2) followed by the breaker that the outlet is connected to. These locations are not exact and many outlets have not been traced yet (shown by a question mark).
Breaker boxes
Take pictures of breaker box or just make a drawing of it?