January 17, 2017

From Hive13 Wiki
Revision as of 17:13, 24 January 2017 by Ry13 (talk | contribs) (→‎Minutes)
Jump to navigation Jump to search
Meetings
Previous Meeting: January 10, 2017 Meeting Procedure Next Meeting: January 24, 2017

Coordinates

Time: 7:30 PM

Space: Anchor Building, 2929 Spring Grove Ave.

Agenda

Housekeeping

  • Noise Curfew - Quiet hours are 10:30pm to 7am until further notice.
  • Liability waivers must be legible

Old Business

  • CNC Classes Continue
    • Saturday January 21 from 10am to 4pm (with a break in there for lunch).
  • CNC Dust Collection
    • Progress update

New Business

  • 2 vote tonight, see below
  • $300 for quick clamps - vote next week
  • Non-hive owned tools - vote date possibly Jan 31st, or TBD
    • Needs discussion :)
  • Unequal use of space - vote date TBD
    • Needs discussion :)

Votes

  • Maintain a stock of 4' x 8' plywood - $680
    • $480 for 10 sheets of current nice stuff (currently under Coy's ownership)
    • $200 for other cheaper sheets
    • All non-hive owned wood not in approved storage removed by Jan 31st
  • Have flat plywood storage available - $350 MAX
    • Use current pallet shelves and add some supports/other levels - $350 MAX
A N Y
Improve Dust Collection System - up to $1000
Local # # #
Online 0 0 4
Total
Edge Technology Pro Tram System - $130
Local # # #
Online 0 0 3
Total
  • DC Online Votes- Tim Gregg, Andrew More, Coy Paeltz, Lorin Parker
  • Tram Online Votes - Tim Gregg, Brad Walsh, Mike Horwath

Minutes

Old Business

  • CNC Classes Continue
    • Saturday January 21 from 10am to 4pm (with a break in there for lunch).
  • Dust Collection
    • Andrew and Ry reorganized the existing system, removing a long pipe while serving the same tools.
    • New tool connections will be forthcoming.
  • Mike will be teaching a gigabit and code class on the 28th of this month.

New Business

  • Mike is taking over as fab lab warden.
  • The big laser sensor has been connected. Calibration remains.
  • Lorin just finished putting the gearing reduction on the ultimaker. It should reappear next week.
  • Lorin also finsihed the reflow toaster.
  • Lorin needs some volunteer labor to complete the space, tentatively Friday evening.
  • Our next second Tuesday talk will cover wood carving.

Votes

  • Maintain a stock of 4' x 8' plywood - $680
    • Total - 22
    • Abstain - 7
    • No - 11
    • Yes - 4
    • online yes - 1
    • Vote does not pass.
  • Have flat plywood storage available - $350
    • Total - 22
    • A - 5
    • N - 5
    • Y - 11
    • Vote passes. However, we may have sufficient crossbeams on the current woodshop member storage rack.

Round Tuit Round

  • Greg - Did some wiring on the RV.
  • Chris D - Got some windows drivers to work
  • Chris H - Drank things, studied tea, fermented math.
  • Brad W - Machined a chuck for the wood lathe
  • Ken - Has been enjoying two days of urine tests.
  • Kevin - Metal warden. Returning after pnuemonia.
  • Tim - mumble. mumblemumble.
  • Craig - Made some mumble boards.
  • Coy - started working on the CNC spoilboard
  • Mark - Second visit. interested in prototyping and 3d printing
  • David - New visitor. Interested in weldinfg.
  • Steve - Got a new car.
  • Ian - Working on the finance website. Got a promotion at work,
  • Andrew - REorganized the dust collection.
  • Will - Has ben doing much sewing and mending.
  • Brent - Soldeirng on arduino based projects for the contemporary arts sensor. Working on a Korg synthisizer.
  • Dave - Working on many projects this week.
  • Kerensa - Created a mock up system in photoshop.
  • Mike - Has no time for fun.
  • Lorin - Finished the soldering reflow oven. It has many curves. Working on the ultimaker.
  • Elly - Working on new food stuff. Seasoned a wok. Learned to cook shoes
  • Ryan - Oncall. Cleaned the electronics bench. Making bad jokes.