Difference between revisions of "July 21, 2020"
Jump to navigation
Jump to search
(Created page with "{{Meeting}} ==Time and Place== '''Time:''' 7:30 PM<br> '''Place:''' Telecom<br> <br> To join the video meeting, click this link: https://meet.google.com/kmo-jxzu-auc<br> Oth...") |
(→Move Planning) (Tag: Visual edit) |
||
Line 14: | Line 14: | ||
*Wear a mask at all times. | *Wear a mask at all times. | ||
*Sign in and Sign out sheet. | *Sign in and Sign out sheet. | ||
+ | *Update Liability Waiver with new address and any new verbiage | ||
*keep social distancing | *keep social distancing | ||
*sanitize everything | *sanitize everything | ||
Line 22: | Line 23: | ||
===Moving Stuff=== | ===Moving Stuff=== | ||
+ | |||
*Remaining items at old space? | *Remaining items at old space? | ||
===Electrical=== | ===Electrical=== | ||
− | * Panels W and Z mounted, need cables pulled | + | |
+ | *Panels W and Z mounted, need cables pulled | ||
===Storage=== | ===Storage=== | ||
+ | |||
*Member Storage ready, use intweb or email leadership to get a space assigned | *Member Storage ready, use intweb or email leadership to get a space assigned | ||
*[[Vertical Long Storage]], and Project Parking on hold till higher priority work done | *[[Vertical Long Storage]], and Project Parking on hold till higher priority work done | ||
*[[Vertical Sheet Storage]] - may need some priority | *[[Vertical Sheet Storage]] - may need some priority | ||
+ | |||
+ | === Signage === | ||
+ | |||
+ | * Delegate to #Superior_Signmakers It's time! | ||
+ | * Get vinyl cutter online | ||
+ | * Hang exterior Hive13 sign at Spring Grove entrance | ||
+ | * "We have moved" sign at 2929 | ||
+ | * Way-finding signs on 1st floor and in stairwells | ||
+ | * COVID-19 sign in station | ||
+ | * Hang woodworking, metalworking, etc signs? | ||
+ | * Emergency information signs | ||
+ | * Fire extinguisher signs | ||
+ | * First Aid kit sign | ||
+ | * Others? | ||
===HVAC=== | ===HVAC=== | ||
+ | |||
*Ductwork Negotiation Status? | *Ductwork Negotiation Status? | ||
*Possible call for donations to get AC? | *Possible call for donations to get AC? | ||
===Access Control=== | ===Access Control=== | ||
+ | |||
*Done, access instructions posted | *Done, access instructions posted | ||
===Goals=== | ===Goals=== | ||
+ | |||
*set goals for the coming week(end) | *set goals for the coming week(end) | ||
==Minutes== | ==Minutes== |
Revision as of 10:54, 20 July 2020
Meetings | ||
---|---|---|
Previous Meeting: July 14, 2020 | Meeting Procedure | Next Meeting: July 28, 2020 |
Contents
Time and Place
Time: 7:30 PM
Place: Telecom
To join the video meeting, click this link: https://meet.google.com/kmo-jxzu-auc
Otherwise, to join by phone, dial +1 513-760-6776 and enter this PIN: 863 676 973#
To view more phone numbers, click this link: https://tel.meet/kmo-jxzu-auc?hs=5
Weekly Meeting Agenda
COVID
- Wear a mask at all times.
- Sign in and Sign out sheet.
- Update Liability Waiver with new address and any new verbiage
- keep social distancing
- sanitize everything
- https://coronavirus.ohio.gov/static/responsible/Responsible-Protocols.pdf
Move Planning
Floor Plan: File:2701InitialMoveInLayout.pdf
Moving Stuff
- Remaining items at old space?
Electrical
- Panels W and Z mounted, need cables pulled
Storage
- Member Storage ready, use intweb or email leadership to get a space assigned
- Vertical Long Storage, and Project Parking on hold till higher priority work done
- Vertical Sheet Storage - may need some priority
Signage
- Delegate to #Superior_Signmakers It's time!
- Get vinyl cutter online
- Hang exterior Hive13 sign at Spring Grove entrance
- "We have moved" sign at 2929
- Way-finding signs on 1st floor and in stairwells
- COVID-19 sign in station
- Hang woodworking, metalworking, etc signs?
- Emergency information signs
- Fire extinguisher signs
- First Aid kit sign
- Others?
HVAC
- Ductwork Negotiation Status?
- Possible call for donations to get AC?
Access Control
- Done, access instructions posted
Goals
- set goals for the coming week(end)