===Moving Stuff===
 
===Moving Stuff===
 
===Electrical===
 
===Electrical===
 +
 
*Panel X 100% cable pulled, ???% Receptacles installed, ???% Breakers installed
 
*Panel X 100% cable pulled, ???% Receptacles installed, ???% Breakers installed
 
*Panel Y 25% cable pulled
 
*Panel Y 25% cable pulled
*When is electrician coming to install panels W and Z?
+
*When is electrician coming to install panels W and Z? (DaveS: panels are up.  still need to be hooked up)
 +
 
 
===Storage===
 
===Storage===
 +
 
*need member storage done for people to move stuff from old building
 
*need member storage done for people to move stuff from old building
 
*[[Vertical Long Storage]], [[Vertical Sheet Storage]], and Project Parking on hold till higher priority work done
 
*[[Vertical Long Storage]], [[Vertical Sheet Storage]], and Project Parking on hold till higher priority work done
 +
 
===Walls===
 
===Walls===
 +
 
*Framing done
 
*Framing done
 
*Drywall on hold till electrical finished
 
*Drywall on hold till electrical finished
 
*get remaining drywall brought up so it's not on first floor
 
*get remaining drywall brought up so it's not on first floor
 +
 
===HVAC===
 
===HVAC===
 
===Access Control===
 
===Access Control===
  
 
==Minutes==
 
==Minutes==

Revision as of 12:57, 7 July 2020

Meetings
Previous Meeting: June 30, 2020 Meeting Procedure Next Meeting: July 14, 2020

Time and Place

Time: 7:30 PM
Place: Telecom

To join the video meeting, click this link: https://meet.google.com/kmo-jxzu-auc
Otherwise, to join by phone, dial +1 513-760-6776 and enter this PIN: 863 676 973#
To view more phone numbers, click this link: https://tel.meet/kmo-jxzu-auc?hs=5

Weekly Meeting Agenda

COVID

Elections

  • One week left to vote.
  • PLEASE make sure you participate, we must meet quorum for this election
  • Annual Meeting July 14th

Move Planning

Floor Plan: File:2701InitialMoveInLayout.pdf

Moving Stuff

Electrical

  • Panel X 100% cable pulled, ???% Receptacles installed, ???% Breakers installed
  • Panel Y 25% cable pulled
  • When is electrician coming to install panels W and Z? (DaveS: panels are up. still need to be hooked up)

Storage

Walls

  • Framing done
  • Drywall on hold till electrical finished
  • get remaining drywall brought up so it's not on first floor

HVAC

Access Control

Minutes