June 19, 2018
Meetings | ||
---|---|---|
Previous Meeting: June 12, 2018 | Meeting Procedure | Next Meeting: June 26, 2018 |
Coordinates
Time: 7:30 PM
Space: Anchor Building, 2929 Spring Grove Ave.
Agenda
Housekeeping
- Noise Curfew - Quiet hours are 10:30pm to 7am.
- Shelf B is up for grabs. New stuff goes on Shelf C.
- Liability waivers must be legible.
- Label your personal supplies & tools.
- Try to get your stuff in your Member Storage spots in a box of some sort. Request new storage spots on https://intweb.at.hive13.org
- At the end of the meeting, please put your chair back on the cart.
- Reminder, we are a community. Keep the space clean. If you need to have a mess, claim it on the mailing list. Use the mailing list if you are going to do a long job or will need some equipment for a specific time.
Old Business
- Space re-organization
- Greg and Ryan put together a master plan, including prerequisites
- Electrical work is all done.
- The second A/C in the annex is getting installed.
- The windows have been caulked; during the next rain, we'll check for more leaks.
- Old electronics equipment is set out on the green table and free to a good home.
- Date for Fab Lab move is this Saturday, June 23rd. Please consider showing up to help.
- Roofing Update
- Laser Status
- Sandblasting Cabinet - see mailing list for discussion
- Metalworking Tools - also see mailing list
New Business
- Delta Dorks Update
This Week in Wiki
- Ian fixed some double redirects.
Upcoming events
- Need to decide on next Saturday Cleanup in July.
- Next Board Meeting July 9th.
- Annual Meeting July 24th.
- Official notice will be sent out soon.
- Consider running for an officer or board position.
Votes
- Repair the big laser
- Proposed by Lorin
- $2050
- Components
- 2 EFR or RECI 100W CO2 laser tubes. ~$800-$1000
- Shipping costs will be high due to the length of these tubes (1.5 meters).
- It would be cheaper to purchase a spare tube in the same shipment to save money, as well as prevent future down-time.
- Electrical repair parts. $200-$400 (worst case -- IF a new HV power supply was needed)
- Mirrors, lenses, and other replacements $50
- Industrial controls / safety & protection $100-$200
- Coolant flow switch
- Overcurrent relay for tube
- Over-temperature switch
- Coolant level sensor
- Proper wiring & status indicators
- Padding for shipping costs, duty, etc. $400
- 2 EFR or RECI 100W CO2 laser tubes. ~$800-$1000
- Next week: Socket sets
- Proposed by Brad
- $150
- https://groups.google.com/forum/#!topic/cincihackerspace/wsACBIvYCLI
Minutes
Old Business
- Space re-organization
- Greg and Ryan put together a master plan, including prerequisites
- Electrical work is all done.
- The second A/C in the annex is getting installed.
- The windows have been caulked; during the next rain, we'll check for more leaks.
- Old electronics equipment is set out on the green table and free to a good home.
- Date for Fab Lab move is this Saturday, June 23rd. Please consider showing up to help.
- Nothing new on the roofing.
- Sandblasting - check the mailing list
- Metalworking - air tools are in, discussing bigger tools
- Delta Dorks
- Dave worked in CAD on the carriage.
New Business
- Cleanup July 14th.
- Annual Meeting coming up
- Look out for the official notice
- We will be doing online voting of one sort or another
- Kevin has fixed the spindle sander.
- Usman thought about adding a shower
- The debate went as always: it's a nice idea, but there are some gotcha
- Maker Faire coming up in September.
- Repair activity
- We need people to participate
- Please provide input as to the wood shop layout.
Votes
- Ian proposed a vote for a new AP.
- Brad has a vote for tools next week.
- Laser repair vote
- 11 members, 3 abstain, 0 no, 8 yes
- 8 yes online votes
Frisbee Round
- Ian - finance website
- Usman - has a project, is moving, is building a desk for his new place
- Mark - friend of Usman, showed up with zero context, interesting to hear and see all the projects
- Dave = frustrated vith Slicer PE, can't get prints to stick, might have wet filament
- Greg - installed A/C, prepping for Fab Lab move, intweb work
- Ryan - prepping for Fab Lab move
- Brad - son went to a lot of grad parties, Check Engine light came on, refreshing Python
- Jeremy - fixed turn signals, not filled with cancer
- Chris - welded, made a letter opener
- Nancy - dealt with toothache, had wisdom tooth removed
- Will - family stuff, set up the auto waterer for the rabbits, Home Depot bucket water tower
- Kevin - fixed spindle sander
- Charlie - visiting, went to Michigan Burning Man event
- Kerensa - mumble, family time, 3D printed a pencil sharpener