Difference between revisions of "May 29, 2012"

From Hive13 Wiki
Jump to navigation Jump to search
(Created page with '{{Meeting | Previous Meeting=May 22, 2012 | Next Meeting= June 5, 2012 | MeetingDate=2012/05/29 }} = Coordinates = '''Time:''' 7:30 PM '''Space:''' Anchor Building, [http:…')
 
(Minutes)
 
(3 intermediate revisions by one other user not shown)
Line 17: Line 17:
  
 
== Ongoing Business ==
 
== Ongoing Business ==
 
+
* AC
 
== New Business ==
 
== New Business ==
  
 
= Attendees =
 
= Attendees =
 +
* Paul Vincent
 +
* Dave Menninger
 +
* Dave Myers
 +
* Emily
 +
* Hodapp
 +
* Shadoxx
 +
* Jon Neal
 +
* Mike
 +
* Bill Steele
 +
* John Cairnes
 +
* Brent Steele
 +
* Jim
 +
* Ed
  
 
= Minutes =
 
= Minutes =
 
+
* Electrical w/ Craig
== Other News ==
+
** Site survey is complete
 +
** Junction box in here
 +
** Run 6 box
 +
** AC each get their own drop
 +
** Have not mapped it out yet, still on the agenda
 +
* Jon Neal
 +
** 4 AC installed now
 +
* Bill Steele
 +
** Laser software has been updated
 +
** Old files must be recalculated before sending them to the laser
 +
** Thanks to Emily for the door plate
 +
* Dave Menninger
 +
** Can not be here every single Monday
 +
* Bill & Ed say they will never accept a position of responsibility.
 +
** (Ed clarifies - with the current loose organization structure)
 +
* Hodapp
 +
** Blog entry about Motorcycle
 +
** Would be willing to document other projects
 +
* Ed
 +
** Annual Party
 +
** Early to mid-July
 +
** July 14, So SAY WE ALL

Latest revision as of 11:08, 5 June 2012

Meetings
Previous Meeting: May 22, 2012 Meeting Procedure Next Meeting: June 5, 2012

Coordinates

Time: 7:30 PM

Space: Anchor Building, 2929 Spring Grove Ave.

Agenda

Old Business

  • Electrical update from Craig - Dave M

Ongoing Business

  • AC

New Business

Attendees

  • Paul Vincent
  • Dave Menninger
  • Dave Myers
  • Emily
  • Hodapp
  • Shadoxx
  • Jon Neal
  • Mike
  • Bill Steele
  • John Cairnes
  • Brent Steele
  • Jim
  • Ed

Minutes

  • Electrical w/ Craig
    • Site survey is complete
    • Junction box in here
    • Run 6 box
    • AC each get their own drop
    • Have not mapped it out yet, still on the agenda
  • Jon Neal
    • 4 AC installed now
  • Bill Steele
    • Laser software has been updated
    • Old files must be recalculated before sending them to the laser
    • Thanks to Emily for the door plate
  • Dave Menninger
    • Can not be here every single Monday
  • Bill & Ed say they will never accept a position of responsibility.
    • (Ed clarifies - with the current loose organization structure)
  • Hodapp
    • Blog entry about Motorcycle
    • Would be willing to document other projects
  • Ed
    • Annual Party
    • Early to mid-July
    • July 14, So SAY WE ALL