Move Meeting - March 26th, 2020
Revision as of 06:50, 26 March 2020 by Kevingreenbmx (talk | contribs) (Created page with "{{MoveMeeting}} *Meeting Time: 7:30pm-8:30pm *Meeting Location: Telecom (see mailing list and slack for link/number 1/2 hour before meeting time) *Floor Plan: File:2701Initi...")
Move Meetings | ||
---|---|---|
Previous: March 19th, 2020 | Meeting Procedure | Next: April 2nd, 2020 |
- Meeting Time: 7:30pm-8:30pm
- Meeting Location: Telecom (see mailing list and slack for link/number 1/2 hour before meeting time)
- Floor Plan: File:2701InitialMoveInLayout.pdf
- Trello Board (Schedule/Task list): https://trello.com/b/KhEDs35R/moving-hive13
Contents
Agenda
Build activities with virus restrictions
- We can work on buildout under the "Critical Trades" exemption paragraph (paragraph k), as it supports our continued ability to provide access to tools and material for home and automotive repair (under paragraph k and paragraph h).
- All work is 100% voluntary, don't come in if you are at all hesitant
- absolutely do not come in unless you are in 100% perfect health
- we must follow the required precautions, minimum size teams (4 should be enough for wall building and electrical, avoid more than 6 people in the space at all costs)
- Keep 6 foot distance while working
- have hand sanitizer available and use it regularly
Floor plan
- Kevin updated based on input about HVAC and comments from members, see above
- electrical circuit list/layout at 80%, need input
Wall building BOM and Material Purchase
- https://docs.google.com/spreadsheets/d/1WJwqHAyj9bpOAUXoCigEn_x-1Sm22IK4vo8zdtibiig/edit?usp=sharing
- ~$3,625 not including doors
- Kevin has RFQs out to United, Home Depot, Lowes, Doppes, and L&W
- Kevin will be purchasing and scheduling delivery as soon as the quotes are in** Wall Building will require:
- Ramsets
- Hammers
- Vice grip pliers/clamps
- drills with screw driving bits
- Tin snips
- Razor Blades/box cutters
- straight edges
- levels
- plumb-bob
- chalk line
- sawhorses
- ladders/scaffolding
Electrical
- kevin is getting sick of doing the planning, once the circuit list is together, can someone else take it and use it to put together the list of material to get quotes and order?