Difference between revisions of "Move Meeting - May 21st, 2020"
Jump to navigation
Jump to search
(→Agenda) (Tag: Visual edit) |
(→Build Progress) |
||
Line 16: | Line 16: | ||
*Bathroom/kitchen Framed | *Bathroom/kitchen Framed | ||
*Landlord is covering wall build labor to compensate for delays | *Landlord is covering wall build labor to compensate for delays | ||
− | * | + | *Shower drain |
− | + | ** Would cost about $2500 as it needs to core drill through to the floor below. | |
+ | ** There is a shower on the first floor that we can use | ||
+ | ** Should we have the drain installed or use the shower on the 1st? | ||
===What's Next?=== | ===What's Next?=== |
Revision as of 10:00, 21 May 2020
Move Meetings | ||
---|---|---|
Previous: May 14th, 2020 | Meeting Procedure | Next: May 28th, 2020 |
- Meeting Time: 7:30pm-8:30pm
- Meeting Location: Telecom
- To join the video meeting, click this link: https://meet.google.com/nny-rnee-yyt
- Otherwise, to join by phone, dial +1 501-939-4183 and enter this PIN: 954 248 025#
- To view more phone numbers, click this link: https://tel.meet/nny-rnee-yyt?hs=5
- Floor Plan: File:2701InitialMoveInLayout.pdf
- Trello Board (Schedule/Task list): https://trello.com/b/KhEDs35R/moving-hive13
Agenda
Build Progress
- Material Delivered
- Bathroom/kitchen Framed
- Landlord is covering wall build labor to compensate for delays
- Shower drain
- Would cost about $2500 as it needs to core drill through to the floor below.
- There is a shower on the first floor that we can use
- Should we have the drain installed or use the shower on the 1st?
What's Next?
- Need to take our tools over:
- Hammers
- Vice grip pliers/clamps
- drills with screw driving bits
- Tin snips
- Razor Blades/box cutters
- straight edges
- levels
- plumb-bob
- chalk line
- sawhorses
- ladders/scaffolding
- Hammer drill and drill and driver for tapcons
- What work do we want to do ourselves?