Difference between revisions of "Move Meeting - May 21st, 2020"

From Hive13 Wiki
Jump to navigation Jump to search
(Build Progress)
(What's Next?)
Line 23: Line 23:
 
===What's Next?===
 
===What's Next?===
  
*Need to take our tools over:
+
*Need to take our tools over?
**Hammers
 
**Vice grip pliers/clamps
 
**drills with screw driving bits
 
**Tin snips
 
**Razor Blades/box cutters
 
**straight edges
 
**levels
 
**plumb-bob
 
**chalk line
 
**sawhorses
 
**ladders/scaffolding
 
**Hammer drill and drill and driver for tapcons
 
  
 
*What work do we want to do ourselves?
 
*What work do we want to do ourselves?
  
 
==Minutes==
 
==Minutes==

Revision as of 19:00, 21 May 2020

Move Meetings
Previous: May 14th, 2020 Meeting Procedure Next: May 28th, 2020

Agenda

Build Progress

  • Material Delivered
  • Bathroom/kitchen Framed
  • Landlord is covering wall build labor to compensate for delays
  • Shower drain
    • Would cost about $2500 as it needs to core drill through to the floor below.
    • There is a shower on the first floor that we can use
    • Should we have the drain installed or use the shower on the 1st?

What's Next?

  • Need to take our tools over?
  • What work do we want to do ourselves?

Minutes