Move Meeting - May 21st, 2020

From Hive13 Wiki
Revision as of 10:06, 21 May 2020 by Dvelzy (talk | contribs) (Agenda)
Jump to navigation Jump to search
Move Meetings
Previous: May 14th, 2020 Meeting Procedure Next: May 28th, 2020

Agenda

Build Progress

  • Material Delivered
  • Bathroom/kitchen Framed
  • Landlord is covering wall build labor to compensate for delays
  • The shower drain will cost about $2500 as it needs to core drill through to the floor below. There is a shower on the first floor that we can use. Should we have the drain installed or use the shower on the 1st?

What's Next?

  • Need to take our tools over:
    • Hammers
    • Vice grip pliers/clamps
    • drills with screw driving bits
    • Tin snips
    • Razor Blades/box cutters
    • straight edges
    • levels
    • plumb-bob
    • chalk line
    • sawhorses
    • ladders/scaffolding
    • Hammer drill and drill and driver for tapcons
  • What work do we want to do ourselves?

Minutes