Move Meeting - May 21st, 2020

From Hive13 Wiki
Revision as of 20:00, 21 May 2020 by Kevingreenbmx (talk | contribs) (What's Next?)
Jump to navigation Jump to search
Move Meetings
Previous: May 14th, 2020 Meeting Procedure Next: May 28th, 2020

Agenda

Build Progress

  • Material Delivered
  • Bathroom/kitchen Framed
  • Landlord is covering wall build labor to compensate for delays
  • Shower drain
    • Would cost about $2500 as it needs to core drill through to the floor below.
    • There is a shower on the first floor that we can use
    • Should we have the drain installed or use the shower on the 1st?

What's Next?

  • Need to take our tools over?
  • What work do we want to do ourselves?

Minutes