Move Meeting - May 28th, 2020

From Hive13 Wiki
Revision as of 19:19, 28 May 2020 by Dschwinn (talk | contribs) (Build Progress)
Jump to navigation Jump to search
Move Meetings
Previous: May 21st, 2020 Meeting Procedure Next: June 4th, 2020

Agenda

Build Progress

  • What's going on?
  • Electric supply bids are in from Richards, Graybar and C.E.S. - (CES is winning)
  • In trade for the plumbing build out, 2701 is asking that Hive13 build out the electric for the bathroom. (more than fair)
  • We need to decide what we want to add as electric sub panels. See question is Cable Pullers in SLACK
  • Plumbers will put in gas line T for stove when we designat where to put it . (Oops? On their part.)
  • Hive13 has dibs on the pallet racking on the 3rd floor both sides. We need a member team to move it into place on our side.
  • We can park Dave B's Truck at either location. Park at a dock door at 2701 and leave the sign on the dash.
  • 2701 has purchased exterior door replacements for a number of entries, including ours at the bottom of the stairs. Install TBD.
  • 2701 Windows
  • 2701 has contracted ADT to do fire and burglar alarms. David W. wants to have a conference call with Drew & Dave V re access control selection and integration. He will arrange.
  • DESIGN CHALLENGE. 2701 is asking that Hive13 design and install a door to our space at the top of the front stairs. It's open now and there is a sliding fire door on the inside. Dave V. to post the challenge.

What's Next?

  • Next task is to either bid our the electric installation work or organize and do it ourselves. What work do we want to do ourselves?

Minutes

  • they will go here