The plan for now is to concentrate on the physical construction of the bot.  I have the I/O system breadboarded out, and while it is not completely 'ready to go,' it is close enough that I know what I'm working with as far as components and what-not.  I have been mostly waiting for the parts so I could try to pack everything into the space desired - then I'll finish the software.
The plan for now is to concentrate on the physical construction of the bot.  I have the I/O system breadboarded out, and while it is not completely 'ready to go,' it is close enough that I know what I'm working with as far as components and what-not.  I have been mostly waiting for the parts so I could try to pack everything into the space desired - then I'll finish the software.
'''Jan 27, 2011'''
Slow goings... stopped by the Hive tonight and cut down the wheel hubs and drive shafts - a hack saw went through it like butter - total width of the wheels is now approx 9.7cm.  Also tried my hand at cutting some high-density fiberboard for building out the construction.  Framing this thing is gonna take some doing...


= Current Issues =
= Current Issues =
234

edits