Electrical System - 2929 Historical: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 3: Line 3:
== Needed Upgrades ==
== Needed Upgrades ==
* Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
* Dirty room/metal room badly needs a minimum of one 120V 20A drop. Two would be even better.
* Fab lab could do with another 120V 20A drop.
* Fab lab must have a 240V 20A drop for the new laser + chiller.
* Fab lab could do with another 120V 20A drop to replaced one or two of the outlets tied to P1B19.
* Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
* Ian Blais would like one near the CNC area for the popcorn machine. Could be useful for the CNCs as well.
* Inspect load on main space light circuit and see if we can put two to four on it.
* Inspect load on main space light circuit and see if we can put two to four more lights on it.
** One more light in the woodworking area. (badly needed)
** One more light in the woodworking area. (badly needed)
** One more in the CNC area. (not as badly needed)
** One more in the CNC area. (not as badly needed)
** One more in the dirty room. (badly needed)
** One more in the dirty room. (badly needed)
** One more over meeting area. (not as badly needed)
** One more over meeting area. (not as badly needed)
=== Layout Ideas ===
One idea is to bring in a 100A+ subpanel in the dirty room so we can branch out from there. This would probably cost about $600+, but it would let us be more flexible in the future as well as making it easier to reset breakers. We are also running out of spots on the panels in the main electrical sub panels and this could help with that.
The second idea is to pretty much use up the remaining ~6 spots on the sub panel in the main room. With the upgrades listed above we need 5 spots so we would only have one extra spot left.


== Current outlet layout ==
== Current outlet layout ==