Vacuum Forming Machine: Difference between revisions

From Hive13 Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 14: Line 14:
= Installation =
= Installation =
The machine requires two dedicated 110VAC 15amp circuits.  
The machine requires two dedicated 110VAC 15amp circuits.  
*http://www.centroform.com/home.html


= Certification Process =
= Usage =
* To be determined after installation.


Step 1) Watch these videos prior to requesting use of the welder:
[[Image:EZFORM_SV_1217_me.jpg|frameless|400px]]
*http://www.youtube.com/watch?v=M4bClzfu_Gg&feature=youtu.be
*http://www.youtube.com/watch?v=J7f0PG-cD0Q&feature=youtu.be
*http://www.youtube.com/watch?v=RmLX4Yl53UU&feature=youtu.be
*http://www.youtube.com/watch?v=rLRm14sTsoY&feature=youtu.be
*http://www.youtube.com/watch?v=gphgytmQtEk&feature=youtu.be
*http://www.youtube.com/watch?v=RBcCuYX9YAs&feature=youtu.be
*http://www.youtube.com/watch?v=kH9ayqDo0e4
 
2) Request hands on training from a person already certified
 
3) Hands on training
    a) demonstrate competency to safely turn on and off welder (also attach tips/outlet plugs etc)
    b) demonstrate competency welding bar onto existing certification bars (both tack and finishing welds)
 
 
== Safety Rules ==
 
* Do not use the welder if you have not had proper training.
* Never use the welder without a second person present to act as a fire watch.
* After using the welder, stay at the Hive for at least an hour to be sure that nothing is smoldering.
 
[[Image:Ellie.sewing.JPG|frameless|400px]]

Revision as of 12:23, 15 May 2017


Hive13 Equipment
List of All Documented Equipment


Owner/Loaner: User:Hive13
Hive13 Asset Tag: None
Make/Model: CentroForm LV1827 (google)
Arrival Date: 06/2017
Does it work?: Yes
Certification Needed?: Yes
Contact: User:Daniel
Floorplan: 1A
Vacuum_Forming_Machine.png



Acquisition

Purchase of the CentroForm LV1827 was authorized by member vote in April of 2017. The order was placed with the OEM on May 12,2017. The machines are built-to-order with a stated two week delivery. The machine ships via FedEx Ground as two boxes.

Installation

The machine requires two dedicated 110VAC 15amp circuits.

Usage

  • To be determined after installation.

File:EZFORM SV 1217 me.jpg