June 23, 2020

From Hive13 Wiki
Jump to navigation Jump to search
Meetings
Previous Meeting: June 16, 2020 Meeting Procedure Next Meeting: June 30, 2020


Time and Place

Time: 7:30 PM
Place: Telecom

To join the video meeting, click this link: https://meet.google.com/kmo-jxzu-auc
Otherwise, to join by phone, dial +1 513-760-6776 and enter this PIN: 863 676 973#
To view more phone numbers, click this link: https://tel.meet/kmo-jxzu-auc?hs=5

Weekly Meeting Agenda

COVID

Elections

  • Nominations open till 28th
  • Votes go out July 1st
  • Annual Meeting July 14th

Move Planning

Walls

  • Framing done
  • Drywall on hold till electrical finished
  • get remaining drywall brought up so it's not on first floor

Electrical

  • Panel X 100% cable pulled, 75% Receptacles installed, 30% Breakers installed
  • Panel Y 25% cable pulled
  • When is electrician coming to install panels W and Z?

Storage

  • Vertical Long Storage
    • Kevin designed, Todd volunteered to build
    • OK with 6 sheets plywood and pocket hole screws ($200-$250) on move budget for this?
  • Vertical Sheet Storage
    • ~12" wide spaces in empty long pallet rack
    • open at top/front to allow full size and oversize sheet goods to stand vertically
    • more sturdy that the old space's flimsy wire dividers if possible
    • Welded square tube dividers maybe?
    • Who will lead?
  • project parking
    • pallet racks assembled, need 2x4 and plywood shelves cut/installed
    • green floor marking tape as shown in floorplan marking project parking area around shelves
    • Who will lead?

HVAC

  • Quotes for Air Conditioning
  • Ductwork Cost

Access Control

  • Any Progress?

Moving Stuff

  • Rent at 2701 begins Aug 1. Move quickly or take time and pay double rent for several months? Vote of membership?
  • Wood Shop
  • Machine Shop
  • Lasers
  • Glass
  • What other stuff?
    • How do we keep stuff that is moved organized and out of the way of build work?

Minutes

Elections open till sunday night

Move:

No update on when electrician will get panels W and Z installed

Thumbs up on vertical storage build on move budget.

Let vertical storage drift, after move, same project parking

HVAC - got bill that was way higher than expected, negotiating to reduce by trading labor on other things, like access control and something with AC

Getting quotes with AC, there are options, put one in each furnace or possibly just do one for now.

No progress on access control, no decisions made

We are going to try to have everything out by August 1st, no later than the end of August.

Let’s set up wooden shelves in the front area as temp storage for moved stuff, start moving everything. Dave S.

Need member storage finished - Dave S. to lead

Wood shop - commit to move woodshop by end of weekend

Priorities for this weekend:

  1. Move Wood Shop
  2. WoodShop Electrical
  3. Setting temporary staging in front space of new hive
  4. Finishing member storage
  5. Other Electrical Work

We need:

  1. PEOPLE
  2. Trucks and trailers
  3. Carts for moving stuff at old hive

First thing: get pallet jack, pallet, to old hive