June 26, 2018
Jump to navigation
Jump to search
Meetings | ||
---|---|---|
Previous Meeting: June 19, 2018 | Meeting Procedure | Next Meeting: July 3, 2018 |
Coordinates
Time: 7:30 PM
Space: Anchor Building, 2929 Spring Grove Ave.
Agenda
Housekeeping
- Noise Curfew - Quiet hours are 10:30pm to 7am.
- Shelf A is up for grabs. New stuff goes on Shelf B.
- Liability waivers must be legible.
- Label your personal supplies & tools.
- Try to get your stuff in your Member Storage spots in a box of some sort. Request new storage spots on https://intweb.at.hive13.org
- At the end of the meeting, please put your chair back on the cart.
- Reminder, we are a community. Keep the space clean. If you need to have a mess, claim it on the mailing list. Use the mailing list if you are going to do a long job or will need some equipment for a specific time.
Old Business
- Old electronics equipment is set out on the green table and free to a good home. They will be disposed of by this weekend.
- Roofing Update
- Sandblasting Cabinet - see mailing list for discussion
- Metalworking Tools - also see mailing list
New Business
- Delta Dorks Update
- Fab Lab move and Lounge Renovation
- Several people showed up to help
- Much progress was made
- We got almost everything moved
- There's still the grey filing cabinet to move into the annex.
- It's staying where it is for now for space reasons
- The 3D printer area still needs to be set up
- The lasers are pending a new vent fan to be working, and the big laser is pending an overhaul
- We need to run Ethernet into the annex for the computers
- We got almost everything moved
- Lounge renovation is under way
- The old ceiling on the south side is down and the insulation fixed (minus what needs the dividing wall down to fix).
- Next steps
- Sweep the south side and move the lounge furniture over to the south side after the meeting
- Tear the north side ceiling apart and fix the insulation
- Tear down the dividing wall
- If you want to help, sweep some of the lounge with the Shop Vac. It doesn't matter how much you sweep or if it's going to get dirty again, it helps a lot.
This Week in Wiki
- Greg updated the Electrical System page with the new runs finally.
- Lorin added a link to the big laser cutter manual.
Upcoming events
- Next Board Meeting July 9th.
- Saturday Cleanup July 14th.
- Annual Meeting July 24th.
- Official notice will be sent out soon.
- Consider running for an officer or board position.
- Maker Faire coming up in September. Do we want to participate? If so, with what?
- Repair activity
- We need people to participate
Votes
- Socket sets
- Proposed by Brad
- $150
- https://groups.google.com/forum/#!topic/cincihackerspace/wsACBIvYCLI
- Additional AP
- Proposed by Ian
- $200
- Will solidify WiFi coverage throughout the Hive
- Next week: Lounge Renovation
- Proposed by Greg
- $2500
- Covers things like new ceiling tiles and hangers, trim, paint, drywalling, new carpet
- Probably won't use it all but the headroom is there
Minutes
Housekeeping
- As per usual.
Old Business
- Dave is investigating metalworking tool prices. He has been somewhat delayed by space reorg activities.
- Old electronics equipment is set out on the green table and free to a good home. They will be disposed of by this weekend.
- Roofing Update
- Sandblasting Cabinet - see mailing list for discussion
- Space Reorganization
- Thanks to all who showed up Saturday.
- Fablab is moved. We've made a start on removing the wall.
- Need to run networking cable to the annex.
- Greg needs help moving furniture tonight.
New Business
- Does anyone know where the Bosch batteries and radio went?
Upcoming Events
- Next Board Meeting July 9th.
- Saturday Cleanup July 14th.
- Annual Meeting July 24th.
- Official notice will be sent out soon.
- Consider running for an officer or board position.
- Maker Faire coming up in September 15 and 16. Do we want to participate? I
- If so, with what?
- We need people to participate
- A repair booth has been suggested.
Votes
- Socket sets
- Proposed by Brad
- $150
- https://groups.google.com/forum/#!topic/cincihackerspace/wsACBIvYCLI
- 14 Present
- Abstain - 2
- No - 0
- Yes - 12
- Additional AP
- Proposed by Ian
- $200
- Will solidify WiFi coverage throughout the Hive
- 14 Present
- Abstain - 1
- No - 0
- Yes - 13
- Next week: Lounge Renovation
- Proposed by Greg
- $2500
- Covers things like new ceiling tiles and hangers, trim, paint, drywalling, new carpet
- Probably won't use it all but the headroom is there
Round Tuit Round
- Dave L - Has been out of town
- Ian B - working on voting system for intweb
- Chris H - Made a bottle opener out of a railroad tie.
- Matt - Has been out due to illness. Working on calibrating his modular synth project.
- Greg A - Worked on the lounge move. Worked on intweb.
- Jim D - Has been in Detroit lately. Demoed his stepper motor project.
- Brad - helped with the laser move.
- Ryan H - Worked on the fablab move. Looking for a pneumatic Cylinder.
- Jeremy Y - Cincy locksport will be Monday.
- Meydan - Becoming a member tonight.
- Kevin - Sold his car.
- Nancy G - Watched vintage race cars at mid Ohio.
- Heath - Returning after a long absence.
- Will B - Helped out with the reorg. Learning small motor repair. Beginning plumbing projects.
- Dave V - Tracing down broken pipes. Built a filament dryer.
- Joseph - Learned to use transistors as switches.